Hands-On at the Greifswald Wastewater Treatment Plant

Preparation of the discharge line at the Greifswald wastewater treatment plant to install a QH200. The pumping station currently achieves a reduction in pressure pulsations of more than 90%.

Weitere News

Hydronauten Konferenz ODEF Ostdeutsches Energieforum Announcement

14. East German Energy Forum

14. East German Energy Forum with Hydronauten On September 23–24, 2025, the 14. East German Energy Forum took place in Leipzig – the leading platform

We Talk IoT Episode 68 Titelbild

Podcast We Talk IoT Episode 68

Hydronauten zu Gast bei “We talk IoT” – Episode 68 We had the special opportunity to appear as guests on the 68th episode of the