Preparation of the discharge line at the Greifswald wastewater treatment plant to install a QH200. The pump station currently achieves a reduction in pressure pulsations of more than 90%.

Podcast We Talk IoT Episode 68
Hydronauten zu Gast bei “We talk IoT” – Episode 68 We had the special opportunity to appear as guests on the 68th episode of the