Preparation of the discharge line at the Greifswald wastewater treatment plant to install a QH200. The pump station currently achieves a reduction in pressure pulsations of more than 90%.

Hydronauten won the Advanced Electronics Challenge 2025
At Embedded World 2025 in Nuremberg, Hydronauten GmbH was honored as the winner of this year’s BayStartUP Advanced Electronics Challenge, in partnership with Avnet Silica ,